Field Engineer Trainee
Slb (Schlumberger)
المشروع: Artificial lift-ESPs
2025-02-03 - 2025-05-07
• I’ve worked for three months at SLB in the Artificial Lift Department, where I gained extensive experience with Electrical Submersible Pumps (ESPs). • I participated in over 15 field jobs across major oil fields including West Qurna 1 (PCH), West Qurna 2 (Lukoil), Al-Zubair (Eni), and CNOOC and also worked at Slb main base camp. Throughout this period, I developed a deep understanding of ESP components, operations, and field procedures. I was actively involved in installation, run-in-hole, pull-out, and dismantling operations. My tasks included operating the cable spooler, installing CCCP on the rig floor during 6-hour shifts, conducting phase-to-phase and phase-to-ground tests, sensor testing, and cable splicing. • I also worked on troubleshooting procedures, learned how to interpret VSD (Variable Speed Drive) readings, and participated in ESP commissioning and start-up activities and I was also involved in civil work such as preparing and installing cable trays, junction boxes
