Site Manager
Naqaa Al-Rawafed Company for General Contracting limited
Project: Establishment of a Specialized Dental Center in Qayara Subdistrict supervision by Sonangol
2025-05-03 - 2026-07-16
responsible for supervising all construction activities on site, ensuring the work is completed safely, on time, within budget, and according to the drawings and specifications. The role also includes coordinating with subcontractors, consultants, and the client, monitoring quality, managing resources, and solving any issues that arise during construction
Area Manager
Biltek Construction International Company
Project: Chormor LPG plant supervision by Dana gas
2024-01-01 - 2024-09-30
Supervising the implementation of the activities within the Utility Area, ensuring alignment with the organization's goals, and overseeing site activities to ensure quality and compliance with safety standards, working to enhance communication and collaboration among project teams to successfully implement the project
Site engineer
Biltek Construction International Company
Project: Chormor LPG plant supervision by Dana gas
2023-07-04 - 2023-12-31
Responsible for 9 Area, carrying out planning for excavation, sand bedding, installation of precast, hand over and solving problems according to safety standards
Site engineer
Al SAMI GENERAL TRADING Company
Project: West of Mosul 400 K.V GIS Super Grid substation
2022-07-01 - 2023-07-01
Responsible for Constructing of the buildings 132 kv, 11 kv West, 11 kv Easte, EDG Room, Warehouse, in addition to all the Cable trenches, Cable pit, Duct banks, Road crossing and the roads.
Site engineer
ZOZIK GROUB
Project: El Kasik substation 400/132 K. V
2021-08-01 - 2022-06-30
Responsible for Constructing transformers and heavy roads, Installation of boundary wall (pad footing, columns and panels) and Backfilling and compacting area for all buildings with soil and subbase as per drawing.
Site engineer/ Qs
Al Fahad Al-Mubaraka Company
2020-08-01 - 2021-07-31
Responsible for base (concrete wall) of main transformers, construction trench cable 11kV line, and construction bases for reactor and serge arrester for Tal Afar
substation 132 KV
Responsible for Rehabilitation such as painting and Suspending ceiling work etc for Ewenat substation 132 K. V .
Implementation of the project Building a 12-class school in the Tal Afar district